Moderator: Team Cub
by Eugene » Thu Apr 29, 2010 7:25 pm
 Approximately 200 feet of hand dug 16" deep trench for a 4" drainage tile.  Managed to cut the electric dog fence. Top of the slope looking down.  Side view of trench area. Seepage starts at the tp of the draw. Area has been permanently wet. Planning on putting part of a garden on opposite slope.  Near the bottom of the slope, looking up.
-
Eugene
- Cub Pro

-
- Posts: 10931
- Joined: Fri Jul 02, 2004 9:52 pm
- Location: Mo. Linn
- Zip Code: 65051
by beaconlight » Thu Apr 29, 2010 11:50 pm
Looking good. That much digging gets to be exercise.
Bill
"Life's tough.It's even tougher if you're stupid." - John Wayne
" We hang petty thieves and appoint the great ones to public office." - Aesop
-

beaconlight
- Cub Pro

-
- Posts: 7673
- Joined: Thu Aug 19, 2004 2:31 pm
- Location: NY Staten Island & Franklin
- Zip Code: 10314
by Eugene » Fri Apr 30, 2010 10:03 am
No gym membership for me.
Wet, so wet that the Cub Cadet would get stuck when trying to mow up hill. Used to use a puch mower to mow the area or with the Cub Cadet mow down hill then drive around.
No rocks encountered. Easy digging. Biggest problem was the clay stuck to the spade, making the spade very heavy. About 6 hours digging time over 3 days.
-
Eugene
- Cub Pro

-
- Posts: 10931
- Joined: Fri Jul 02, 2004 9:52 pm
- Location: Mo. Linn
- Zip Code: 65051
by Bill E Bob » Fri Apr 30, 2010 10:43 am
Looks like you got WELL acquainted with a sharpshooter  Clay digging sure ain't no fun  Remind me NEVER to start a fight with you 
-
Bill E Bob
- 501 Club

-
- Posts: 2719
- Joined: Wed May 31, 2006 12:09 pm
- Location: OK, Skiatook
- Zip Code: 74070

- Circle of Safety: Y
by Jimdawg » Fri Apr 30, 2010 12:42 pm
great job, that is a lot of work that only people familiar with a spade and shovel truly appreciate.
~ Jim
-

Jimdawg
- 501 Club

-
- Posts: 626
- Joined: Tue May 01, 2007 4:05 pm
- Location: MA, Dartmouth
- Zip Code: 02748
-
by Eugene » Fri Apr 30, 2010 1:29 pm
Bottom 100 feet of tiling (plastic tubing with sock) installed. Upper half of trench is still open. Appears to be draining about ½ gallon a minute after being trenched for 3 days. First day of open trench, appeared to be draining about 1 to 2 gallons a minute.
Daily checking condition of soil. This morning still have one spot with water standing above the soil near the upper end. Will have to dig another 10 or 15 foot long trench for an additional lateral.
Total cost. About $130- or $140-. Biggest cost was about $108- for the tubing plus the cost of the “Y“ fittings.
-
Eugene
- Cub Pro

-
- Posts: 10931
- Joined: Fri Jul 02, 2004 9:52 pm
- Location: Mo. Linn
- Zip Code: 65051
Return to Gardening
Who is online
Users browsing this forum: No registered users and 0 guests
|
|