Got a project that you are working on that is not a tractor? Maybe a barn to hold your tractors or just fun stuff like woodworking, glass, tools, sheds, gardens, custom implements, etc., this is the place to talk about it.
Moderator: Team Cub
by Thackery » Sat Nov 19, 2011 10:16 am
Good information on concrete/cement, costs, etc. I want to get the floor of my 100+ yr. barn poured. I would like to do it myself to save money but then again I'm nervous about a truck pulling up and dumping me more of a job than I can handle, and/or there are skills about working the concrete that I don't have. Maybe someone could give some basic "this is how you work concrete" for a job like a shop floor, etc.
I havn't watched anyone work concrete since I was a kid. I did get to see a big form that was going to be a fixed equipment pad, probably 16" thick, blow out while it was being poured, what a mess. The job quickly passed the point of no return, the workers had to take loader buckets of concrete out back and dump it. But that's a different kind of job than floors, etc.
Thackery
1953 Cub, Sickle Mower, 42" Mower, Cultivators, 189 Double Plow, 54 Blade, Grader Blade 1968 Lo-Boy w/1000 Loader, 1957 Lo-Boy w/FH, FH Disc, FH Potato Plow.
-
Thackery
- Cub Star!!

-
- Posts: 414
- Joined: Wed Nov 23, 2005 2:53 pm
- Location: West Central Ohio
by Don McCombs » Sat Nov 19, 2011 12:53 pm
Doug,
Here's my personal opinion...
Installing concrete, in any form, is back-breaking work. Once you start, you're in it until it's completely done. Unless you have a bunch of experienced friends, who are willing to help you, I feel that a project of that size is best left to the professionals.
Don McCombs MD, Deep Creek Lake
"1950 Something" Farmall Cub, Cub-193 Moldboard Plow 1977 IH Cub w/FH, L-F194 Moldboard Plow, L-38 Disk, L-F1 Platform Carrier, Mott FHC Mower 1948 Farmall Super A, IH 22 Mower 1951 Farmall Super C w/FH
-

Don McCombs
- Cub Pro

-
- Posts: 9520
- Joined: Mon Feb 03, 2003 6:45 am
- Location: MD, Deep Creek Lake
- Zip Code: 21550
- Tractors Owned: .
"1950 Something" Farmall Cub 1977 IH Cub w/FH 1948 Farmall Super A 1951 Farmall Super C w/FH

- Circle of Safety: Y
-
by ScottyD'sdad » Sat Nov 19, 2011 1:14 pm
Thackery wrote:Good information on concrete/cement, costs, etc. I want to get the floor of my 100+ yr. barn poured. I would like to do it myself to save money but then again I'm nervous about a truck pulling up and dumping me more of a job than I can handle, and/or there are skills about working the concrete that I don't have. Maybe someone could give some basic "this is how you work concrete" for a job like a shop floor, etc.
I havn't watched anyone work concrete since I was a kid. I did get to see a big form that was going to be a fixed equipment pad, probably 16" thick, blow out while it was being poured, what a mess. The job quickly passed the point of no return, the workers had to take loader buckets of concrete out back and dump it. But that's a different kind of job than floors, etc.
Thackery
I have to agree with Don, on this one. I had my shop floor done, professionally, and I'm as cheap as they come. I do respect my old back bone, and hope to get a few more years out of it. Ed
50 ,52,53,56,59 F Cubs, 55,55,57,63,63 fast hitch, 64 lo-boys, 71 154, 184 lo-boy,61 cadet original. IH spreader,IH corn grinder, Oli. OC3 ,AC D10 ,IH 444 , Potato digger, wagner ldr 3 power units.
-
ScottyD'sdad
- Cub Pro

-
- Posts: 4608
- Joined: Thu Aug 31, 2006 7:00 pm
- Location: Ma. Rehoboth
- Zip Code: 02769

- Circle of Safety: Y
by regwal » Sat Nov 19, 2011 4:11 pm
Good advice from all of you. Now I have to decide which I will pour and if this old man can handle it on a DIY project. Cement yes, concrete however might be a bit much. Thanks for all your input, it gave me more to consider before starting anything. Reg
-
regwal
- Cub Star!

-
- Posts: 239
- Joined: Fri Jul 30, 2010 3:44 pm
- Location: St. Mary, GA
- Zip Code: 31558
- eBay ID: regwal
- Skype Name: regwal
- Tractors Owned: 3 Cubs 1 CC
1955 Cub Slow Poke 1955 Cub Lil Red 1954 Cub Poor Thing Cub Cadet 86 2254 Husky
by Rudi » Sat Nov 19, 2011 6:11 pm
Reg:
All of my training in architectural design and of course my experience of the years as a contractor dictates that a slab has to be on a well drained undisturbed soil site with a good bed of 0"-3/4" crushed rock and re-enforced with either re-bar or re-enforcing wire mesh. If not then frost heaves will crack the floor. Ask me.. I cut corners years ago on my shop floor and omitted the re-enforcing wire mesh and my floor has literally broken up. Re-enforced concrete floors are a must. It only adds a couple hundred to the cost if you buy new mesh and substantially less if you use recycled products.
As Billy said if your a pouring a slab, then I would simply remove the overburden - aka - top soil and backfill with drainage material such as the crushed rock and build up the drainage so that it is higher than the surrounding grade. Tamp the crushed rock with a portable plate tamper inside the forms and then have at it.
Setting the foundation base and the forms is something you can do yourself, take your time, research it --- Reader's Digest Back To Basics has a good section on exactly this subject and is worth looking into or similar articles. You can even pour the floor yourself and screed the concrete as well. However I would definitely suggest that you hire a good concrete finisher who will not only float the floor but if control joints are needed, can do the job properly and economically.
Confusion breeds Discussion which breeds Knowledge which breeds Confidence which breeds Friendship  "Before beginning a hunt, it is wise to ask someone what you are looking for before you begin looking for it." - Winnie Cub Manual Server
-

Rudi
- Team Cub

-
- Posts: 27193
- Joined: Sun Feb 02, 2003 8:37 pm
- Location: NB Dieppe, Canada
- Zip Code: E1A7J3
- eBay ID: ve9rhs
- Skype Name: R.H. "Rudi" Saueracker, SSM
- Tractors Owned: 1947 Cub "Granny"
1948 Cub "Ellie-Mae" 1951 Cub "Jethro" Dad's Putt-Putt IH 129 CC

- Circle of Safety: Y
-
by regwal » Sat Nov 19, 2011 6:43 pm
Rudy, Thanks. I am serching and asking questions at the same time. I will soon be ready to start and all the input here will be useful. Reg
-
regwal
- Cub Star!

-
- Posts: 239
- Joined: Fri Jul 30, 2010 3:44 pm
- Location: St. Mary, GA
- Zip Code: 31558
- eBay ID: regwal
- Skype Name: regwal
- Tractors Owned: 3 Cubs 1 CC
1955 Cub Slow Poke 1955 Cub Lil Red 1954 Cub Poor Thing Cub Cadet 86 2254 Husky
by clodhopper » Sun Nov 20, 2011 10:06 pm
The monolithic portions should be at least 12 inches below existing grade,be at least 12 inches wide at the base, and should have at least 2 #4 rebars in the lower 1/3 of the footing sections. You also need 1/2 inch "j" hook bolts ( hot dipped galvanized) with 7 inches of embedment in the concrete. The bolts need to be within 12" of each corner and joint in the bottom plate, and every 6 feet linear. The bottom plate should be treated yellow pine. If you dont have a good basic foundation, the rest of the building is irrelevant. If you have alot of slope on the site, I would recommend a stemwall slab.
The older I get, the younger I was.
-

clodhopper
- 501 Club

-
- Posts: 655
- Joined: Sat May 07, 2011 8:20 pm
- Zip Code: 27526
- Tractors Owned: 1950 Cub Demo
1978 Cub Cadet 1650 cub 193 plow cub 174 planter cub sidedresser cub 144 cultivator cadet 50a deck 60A grader blade

- Circle of Safety: Y
by brichter » Mon Nov 21, 2011 8:53 am
Don't remember the exact cost but I built a 32 X 60 and the concrete/cement floor cost more than the rest of the barn.
If you're gonna dream or steal, do it BIG
The best things in life aren't things. 1951 Cub 1963 Corvair lots more junk
-
brichter
- 501 Club

-
- Posts: 1233
- Joined: Sun Jul 11, 2004 2:23 pm
- Location: FL, Kinard
- Zip Code: 32449
- eBay ID: Kinardhippy
- Skype Name: Billy.Ray.Richter

- Circle of Safety: Y
by Boss Hog » Mon Nov 21, 2011 10:57 am
You can figure if the cement is $1500 the labor will be that much too to have it floated and formed up
IN GOD WE TRUST All others pay cash Boss Hog Power corrupts; absolute power corrupts absolutely byJohn Emerich Edward Dalberg
-

Boss Hog
- Cub Pro

-
- Posts: 9040
- Joined: Mon Oct 24, 2005 8:35 pm
- Location: VA. Randolph
- Zip Code: 23962
- eBay ID: dmb2613

- Circle of Safety: Y
Return to Projects Forum
Who is online
Users browsing this forum: No registered users and 0 guests
|
|