This site uses cookies to maintain login information on FarmallCub.Com. Click the X in the banner upper right corner to close this notice. For more information on our privacy policy, visit this link: Privacy Policy
NEW REGISTERED MEMBERS: Be sure to check your SPAM/JUNK folders for the activation email.
shop
-
- 10+ Years
- Posts: 297
- Joined: Fri Jul 30, 2010 3:44 pm
- Zip Code: 31558
- eBay ID: regwal
- Skype Name: regwal
- Tractors Owned: 3 Cubs 1 CC
1955 Cub Slow Poke
1955 Cub Lil Red
1954 Cub Poor Thing
Cub Cadet 86
2254 Husky - Location: St. Mary, GA
shop
I plan to start soon on a shop/shed 20x40. I'm thinking a slab 4 inches thick should work well for cubs. Any thoughts on the minimum thickness of slab and about how much is a yard of cement?
-
- Team Cub Mentor
- Posts: 20379
- Joined: Fri Jul 02, 2004 9:52 pm
- Zip Code: 65051
- Circle of Safety: Y
- Location: Mo. Linn
Re: shop
4 inches of reinforced cement should be adequate for your shop.
On the cement. Only way to know is to inquire at your local concrete shop/firm/plant. My ball park guess is $1300- to $1500- for the cement. But then, the local cement plant has a delivery charge based upon milage and quantity.
On the cement. Only way to know is to inquire at your local concrete shop/firm/plant. My ball park guess is $1300- to $1500- for the cement. But then, the local cement plant has a delivery charge based upon milage and quantity.
I have an excuse. CRS.
-
- Cub Pro
- Posts: 4435
- Joined: Wed Dec 26, 2007 7:45 pm
- Zip Code: 32536
- Circle of Safety: Y
- Location: FL, Crestview
Re: shop
Four inches should be good. I would dig out a little deeper at the doors/entry ways for added strength. I see you are is St. Marys, the last time I called the company in Baldwin, Fla, they were charging somewhere in the $100/yrd range for fiber.
Eugene is quick!!
Eugene is quick!!
Screwstick #3934
FCub - LoBoy - Numbered Series - Power Unit Databases
FCub - LoBoy - Numbered Series - Power Unit Databases
-
- 10+ Years
- Posts: 250
- Joined: Sun Aug 22, 2010 8:10 pm
- Zip Code: 46112
- Tractors Owned: 47' Cub
49' H
55' 300U
47' Oliver 70 Row Crop
Mott mower
cultivators
#8 2-14 Little Genius Plow - Location: Brownsburg, IN
Re: shop
I built a 30 x 50 barn a few years ago. I had planned on 4" only because I had all cub cadets. I decided at the last minute to install 4" of crushed stone and 6" of concrete. I am sure glad I did.i now have a couple cadets, 2 farmall cubs and my grandfathers old H.
Check with your local concrete supplier for cost per yard. I'm sure they have a minimum and a possible delivery charge.
Labor to place and finish should'nt be much more. All depends on location.
Just my .02
Check with your local concrete supplier for cost per yard. I'm sure they have a minimum and a possible delivery charge.
Labor to place and finish should'nt be much more. All depends on location.
Just my .02
-
- 10+ Years
- Posts: 297
- Joined: Fri Jul 30, 2010 3:44 pm
- Zip Code: 31558
- eBay ID: regwal
- Skype Name: regwal
- Tractors Owned: 3 Cubs 1 CC
1955 Cub Slow Poke
1955 Cub Lil Red
1954 Cub Poor Thing
Cub Cadet 86
2254 Husky - Location: St. Mary, GA
Re: shop
Thanks guys. That is a good idea of a little deeper at doorways. I had also not given any thought to crushed rock. I'm in a sandy location so will think harder on how to proceed. I may have to get cement from Jax. FL, 30 miles away. No demand for cement here because building has all but stopped around this town.
-
- 10+ Years
- Posts: 2680
- Joined: Mon Oct 24, 2005 11:35 am
- Zip Code: 14072
- eBay ID: toysforjake
- Tractors Owned: Lots of Cub Cadets!
1951 Farmall Cub
1977 IH Cub
1966 IH Cub
1965 IH Lo Boy
1964 IH Lo Boy
1949 Farmall Cub
Several IH 154 Lo Boys
1979 IH 184 Lo Boy
Simplicity 4416 Sovereign
Simplicity Conquest
Simplicity Legacy 4x4 Diesel
Mitsubishi MT180D 4x4 Diesel - Circle of Safety: Y
- Location: Grand Island, NY
Re: shop
Regwald,
Definitely do a haunch pour, which means that as others have said, the slab is thicker around the edges and at doorways. Stone may not be necessary in your area. I know that we built a power plant down in Naples Fl, last year, and everything was done right on top of compacted sand. They had sand down about 20 feet, then bedrock. Our biggest problem was that water table was only 6-feet down, so the sand could possibly liquify under the vibration of the gensets. So we built on auger-cast piles down to bedrock, for the real loads. Anyway, TOTALLY different beast. As long as you have drainage away from your building, and you can level and compact the sand, it may be fine. Ask around with local construction guys or at the building dept. in town, and they will let you know what you need to do.
Bill
Definitely do a haunch pour, which means that as others have said, the slab is thicker around the edges and at doorways. Stone may not be necessary in your area. I know that we built a power plant down in Naples Fl, last year, and everything was done right on top of compacted sand. They had sand down about 20 feet, then bedrock. Our biggest problem was that water table was only 6-feet down, so the sand could possibly liquify under the vibration of the gensets. So we built on auger-cast piles down to bedrock, for the real loads. Anyway, TOTALLY different beast. As long as you have drainage away from your building, and you can level and compact the sand, it may be fine. Ask around with local construction guys or at the building dept. in town, and they will let you know what you need to do.
Bill
Cub Cadets 682, 1811, 1864, Simplicity Legacy XL 4x4 Diesel with FEL, 60" mower, 50" Tiller
-
- 10+ Years
- Posts: 42
- Joined: Sun Oct 02, 2011 5:55 pm
- Zip Code: 48140
Re: shop
I just had the gravel floor in the back of my shop dug out and poured this spring. The contractor recommended 4" with fiber knowing that I'd be putting my compact tractor on it. Total cost was about $1500 including digging out about 3", compacting what was left, pouring the slab to match the existing in the rest of the shop, and cutting the control joints. They also added the black expansion joint stuff along the edge of the existing slab as a thermal break since there's a wall there and the other side is heated. This was for a 16x30 area.
-
- 10+ Years
- Posts: 3414
- Joined: Sat May 15, 2004 11:10 am
- Zip Code: 49229
- Location: MI, Britton
Re: shop
Personally I would not dig it out I would build it up. That way in hard rains all the water runs away from the building. All my building at the farm are at least 18" higher than the surrounding grade but then I have a lot of snow and spring runoff to deal with.
Billy
Billy
Take care of your equipment and it will take care of you. 1964 cub. Farmall 100 and 130.
"Those that say it can’t be done should not interrupt the ones who are doing it.”
"Those that say it can’t be done should not interrupt the ones who are doing it.”
-
- 10+ Years
- Posts: 84
- Joined: Sat Aug 06, 2011 6:44 am
- Zip Code: 25526
- Tractors Owned: Kubota MX5100
1968 Cub Lowboy - Circle of Safety: Y
- Location: Hurricane, WV
Re: shop
On my 30x40 I have 8-12" of stone then 5" of the higher PSI cement (I can't recall exactly what it is rated at but I went with the PSI rating for roads). Ended up costing about $500 more for the higher PSI and thickness but I also have no concerns now with breakage. My eqpt. is under 5K but I had a track hoe in there a few weeks ago (9600lbs) and no issues what so ever. Also if you ever add a truck/car lift some require a bit heavier cement base than normal.
1968 Cub Low Boy
Kubota MX5100
Kubota MX5100
-
- Cub Pro
- Posts: 1080
- Joined: Sun Jan 02, 2005 8:36 pm
- Zip Code: 38655
- Tractors Owned: [18] CUBs from 1947 thru 1974; "B" Farmall, [2] John Deere MTs; Ford 600; Ford 4000; and a 1956 IHC S112 Pickup [CUB Hauler]
- Circle of Safety: Y
- Location: Oxford, Ms
Re: shop
Regwal,
[20' x 40' x .333'] + [120' x 1' x 1'] = 14.31 cubic yds. the 120' is for footing around the premiter of bldg. At $75.00 / yd = $1073. At $100 = $1431. Just some figures to work with. Of course this does not include the reinforcing wire/steel.
[20' x 40' x .333'] + [120' x 1' x 1'] = 14.31 cubic yds. the 120' is for footing around the premiter of bldg. At $75.00 / yd = $1073. At $100 = $1431. Just some figures to work with. Of course this does not include the reinforcing wire/steel.
-
- 10+ Years
- Posts: 935
- Joined: Tue Apr 08, 2008 7:01 pm
- Zip Code: 19344
- Circle of Safety: Y
- Location: PA, Honey Brook
Re: shop
regwal wrote:I plan to start soon on a shop/shed 20x40. I'm thinking a slab 4 inches thick should work well for cubs. Any thoughts on the minimum thickness of slab and about how much is a yard of cement?
Are you guy's talking about concrete or bulk cement for mixing on site ?
Cement is mixed with sand and stone to make concrete.
Is this a regional term for concrete by calling it cement?
Kind of like having a ham and cheese sandwich on two pieces of white flour.
Just wondering.
Russ
1979 International Cub (Artie),193 plow,22 sickle mower,144 cultivator,54a blade,59" belly mower,wheel weights
1944 John Deere B , A-3 B-3 two way plow.....Grandpa's Deere,Still can't find his FARMALL A
1944 John Deere B , A-3 B-3 two way plow.....Grandpa's Deere,Still can't find his FARMALL A
-
- Cub Pro
- Posts: 4435
- Joined: Wed Dec 26, 2007 7:45 pm
- Zip Code: 32536
- Circle of Safety: Y
- Location: FL, Crestview
Re: shop
Russ, I think he is (read we are!!) using the terms as one in the same, southern talk I guess.
Kinda like calling all carbonated beverages "cokes", they just come in different colors and flavors!!
Kinda like calling all carbonated beverages "cokes", they just come in different colors and flavors!!
Screwstick #3934
FCub - LoBoy - Numbered Series - Power Unit Databases
FCub - LoBoy - Numbered Series - Power Unit Databases
-
- 10+ Years
- Posts: 935
- Joined: Tue Apr 08, 2008 7:01 pm
- Zip Code: 19344
- Circle of Safety: Y
- Location: PA, Honey Brook
Re: shop
Thanks, now I know
Russ
Russ
1979 International Cub (Artie),193 plow,22 sickle mower,144 cultivator,54a blade,59" belly mower,wheel weights
1944 John Deere B , A-3 B-3 two way plow.....Grandpa's Deere,Still can't find his FARMALL A
1944 John Deere B , A-3 B-3 two way plow.....Grandpa's Deere,Still can't find his FARMALL A
-
- Team Cub Mentor
- Posts: 17489
- Joined: Mon Feb 03, 2003 6:45 am
- Zip Code: 21550
- Tractors Owned: "1950 Something" Farmall Cub
1957 Farmall Cub w/FH
1977 International Cub w/FH
1978 International Cub
1948 Farmall Super A - Circle of Safety: Y
- Location: MD, Deep Creek Lake
Re: shop
The word cement is used instead of concrete in places other than the South.
-
- Team Cub Mentor
- Posts: 24144
- Joined: Sun Feb 02, 2003 12:50 pm
- Zip Code: 43113
- Circle of Safety: Y
- Location: OH, Circleville
Re: shop
Terminology is a wonderful thing! Nobody pours a concrete floor here. Everybody calls them cement floors. Cement contractors pour concrete and we end up with cement floors and sidewalks. But almost everyone calls driveways concrete driveways. Go figure!
Bigdog
If you can't fix it with a hammer, you've got an electrical problem.
My wife says I don't listen to her. - - - - - - - - Or something like that!
http://www.cubtug.com
If you can't fix it with a hammer, you've got an electrical problem.
My wife says I don't listen to her. - - - - - - - - Or something like that!
http://www.cubtug.com
-
- Similar Topics
- Replies
- Views
- Last post
-
- 10
- 2013
-
by Farmalldr812
Thu Mar 31, 2022 8:32 pm
-
- 31
- 8214
-
by ScottyD'sdad
Fri Feb 11, 2022 8:50 am
-
- 0
- 4015
-
by Barnyard
Sun Jun 18, 2023 1:44 pm
-
-
Keeping busy in the shop Attachment(s)
by Greenthumbfarms » Tue Feb 07, 2023 11:02 pm » in Farm Life and Better Half Forum - 11
- 2758
-
by SONNY
Sat Feb 11, 2023 8:01 pm
-
-
-
It pays to shop around for parts
by Bill Hudson » Thu Jun 16, 2022 5:43 pm » in Lo-Boy Series - 154, 184, 185 - 5
- 428
-
by Eugene
Tue Aug 30, 2022 9:34 pm
-
Who is online
Users browsing this forum: No registered users and 0 guests